top of page

Wait & Weight Method Simulator (Surface)

In this simulation, our virtual instructor guides a student through killing a surface stack well using the Wait & Weight Method. All procedures are scored automatically per IADC grading standards for the Supervisor Level Surface Stack course. 

​

Each of our drilling simulators includes access for 1 student for 1 year to go through the simulation as many times as desired. Purchasing gives you access to both the Offline version on your iPad/iPhone and the Web version on your PC/Laptop 

Confirm BOP Panel Lineup

Confirm the BOP is lined up correctly for well kill operations. 

bop-simulator.PNG

Confirm Choke Panel lineup

Confirm the Choke Panel is lined up correctly for well kill operations. 

choke-panel-simulator.PNG

Confirm Standpipe Manifold Lineup

Confirm the Standpipe Manifold is lined up correctly for well kill operations. 

standpipe-manifold-simulator.PNG

Confirm Choke Manifold lineup

Confirm the Choke Manifold is lined up correctly for well kill operations. 

choke-manifold-simulator.PNG

Confirm Trip Tank lineup

Confirm the Trip Tank is lined up correctly for well kill operations. 

trip-tank-simulator.PNG

Check and Set BOP Pressures

Confirm BOP pressures are correct and regulate them correctly.

bop-control-system-simulator.PNG

Bump the Float

Bump the float to determine SIDPP and record it.

choke-panel4.PNG

Fill out a Kill Sheet

Use our interactive kill sheet as you walk through all kill sheet calculations

kill-sheet-simulator.PNG

Confirm Pump Manifold lineup

Confirm the Pump Manifold is lined up correctly for well kill operations. 

pump-manifold-simulator.PNG

Set Pit Level alarms

Conduct key calculations to set pit level alarms to detect additional influx

pump-alarms-simulator.PNG

Communicate your Kill Plan

Answer a series of questions to communicate your kill plan to the rig crew.

communicate-kill-plan-simulator.PNG

Bring Pumps Online to Kill Rate

Bring pumps up to the kill rate and determine Initial Circulating Pressure (ICP).

choke-panel.PNG

Maintain ICP during kick circulation

Maintain ICP constant as you circulate a kick up the wellbore

well-control-sim3-min.PNG

Detect and Handle a Nozzle Plugging kill problem

Follow IADC guidelines to handle a Nozzle Plugging kill problem

well-control-sim8-min.PNG

Detect and Handle a Choke Washout kill problem

Follow IADC guidelines to handle a Choke Washout kill problem

iadc-kill-problems.PNG

Detect and Handle a Nozzle Washout kill problem

Follow IADC guidelines to handle a Nozzle Washout kill problem

well-control-sim5-min.PNG

Detect and Handle a Choke Plugging kill problem

Follow IADC guidelines to handle a Choke Plugging kill problem

well-control-sim4-min.PNG

Handle Gas at the Choke

Handle the rapid change in pressures due to gas at the choke

well-control-sim12-min.PNG

Handle Mud at the Choke

Handle the rapid change in pressures due to mud replacing gas at the choke

well-control-sim13-min.PNG

Shut Down the Pumps

Bring the pumps offline to end the kill operation

well-control-sim10-min.PNG

Analyze well pressures

After shutdown, analyze well pressures to determine if additional circulations are necessary

well-control-sim10-min.PNG
bottom of page